ci: roll out OIDC review workflow #10

Merged
jercik merged 3 commits from ci/oidc-review-runtime-6 into main 2026-08-01 13:23:08 +00:00
Owner

Regenerates the agent-skills Forgejo review closure from j4k-align 1.100.7.

  • replaces the stale 1.100.5 generator-only publication path with the coordinator and dedicated pr-review-post.yml writer
  • keeps public review-tool preparation credential-free; generator-private Axrecipe tooling is installed in an isolated, temporary boundary
  • dispatches one main-pinned writer per finalized slot, serialized per pull request under the canonical forgejo-actions actor
  • binds result retrieval and idempotent receipts to the source workflow run, generator attempt, PR, head, and slot
  • adds fail-closed reviewer-isolation capability checks and limits pending-review cleanup to this writer’s actor
  • retains the managed Node test workflow and its companion closure

Validation:

  • regenerated with j4k-align 1.100.7, then reran the same reconciliation with no further changes
  • j4k-align --repo j4k-oss/agent-skills --local-path <worktree> confirms 18/18 managed repository files and 4/4 workflows synchronized
  • node --test skills/node/rules/assets/graceful-server.test.ts
  • node --check for every managed writer TypeScript module
  • git diff --check

This supersedes the stale 1.100.5 closure and its old-base review failures. There were no submitted review comments to carry forward.

Regenerates the agent-skills Forgejo review closure from `j4k-align` 1.100.7. - replaces the stale 1.100.5 generator-only publication path with the coordinator and dedicated `pr-review-post.yml` writer - keeps public review-tool preparation credential-free; generator-private Axrecipe tooling is installed in an isolated, temporary boundary - dispatches one `main`-pinned writer per finalized slot, serialized per pull request under the canonical `forgejo-actions` actor - binds result retrieval and idempotent receipts to the source workflow run, generator attempt, PR, head, and slot - adds fail-closed reviewer-isolation capability checks and limits pending-review cleanup to this writer’s actor - retains the managed Node test workflow and its companion closure Validation: - regenerated with `j4k-align` 1.100.7, then reran the same reconciliation with no further changes - `j4k-align --repo j4k-oss/agent-skills --local-path <worktree>` confirms 18/18 managed repository files and 4/4 workflows synchronized - `node --test skills/node/rules/assets/graceful-server.test.ts` - `node --check` for every managed writer TypeScript module - `git diff --check` This supersedes the stale 1.100.5 closure and its old-base review failures. There were no submitted review comments to carry forward.
ci: roll out OIDC review workflow
Some checks failed
Node tests / node:test (pull_request) Failing after 10s
commit-msg / commitlint (pull_request) Successful in 42s
PR Review / approach (pr-review-approach-forgejo-2) (pull_request_target) Failing after 49s
PR Review / code (fable draw) (pull_request_target) Failing after 49s
PR Review / approach (smart draw 1) (pull_request_target) Failing after 49s
PR Review / code (smart draw 1) (pull_request_target) Failing after 49s
PR Review / approach (pr-review-approach-forgejo-3) (pull_request_target) Failing after 49s
PR Review / approach (fable draw) (pull_request_target) Failing after 49s
6a62118719
ci: complete review workflow dependencies
Some checks failed
PR Review / approach (smart draw 1) (pull_request_target) Has been skipped
PR Review / approach (fable draw) (pull_request_target) Has been skipped
PR Review / approach (pr-review-approach-forgejo-2) (pull_request_target) Has been skipped
PR Review / approach (pr-review-approach-forgejo-3) (pull_request_target) Has been skipped
Node tests / node:test (pull_request) Successful in 11s
commit-msg / commitlint (pull_request) Successful in 18s
PR Review / code (smart draw 1) (pull_request_target) Failing after 21s
PR Review / code (fable draw) (pull_request_target) Failing after 21s
36e96ce62d
ci: refresh OIDC review workflow
Some checks failed
PR Review / approach (smart draw 1) (pull_request_target) Has been skipped
PR Review / approach (fable draw) (pull_request_target) Has been skipped
PR Review / approach (pr-review-approach-forgejo-2) (pull_request_target) Has been skipped
PR Review / approach (pr-review-approach-forgejo-3) (pull_request_target) Has been skipped
Node tests / node:test (pull_request) Successful in 15s
commit-msg / commitlint (pull_request) Successful in 30s
PR Review / code (smart draw 1) (pull_request_target) Failing after 30s
PR Review / code (fable draw) (pull_request_target) Failing after 30s
33bcf36d0a
jercik merged commit 584428a1dd into main 2026-08-01 13:23:08 +00:00
jercik deleted branch ci/oidc-review-runtime-6 2026-08-01 13:23:08 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
j4k-oss/agent-skills!10
No description provided.