ci: enroll in the managed review path #9

Merged
jercik merged 1 commit from feat/enroll-managed-review into main 2026-08-28 09:53:12 +00:00
Owner

Moves this repository from the old CI reviewers to the managed Review path — the second repository to go, after j4k/review.

Adding the .review-enrolled marker and regenerating with j4k-align --fix-workflows does the whole swap in one pass: review.yml in, pr-review.yml and pr-review-post.yml out. There is no window where both reviewers run.

The org already has what the new workflow needs — the REVIEW_CAPABILITY_TOKEN secret and the REVIEW_SERVICE_URL variable — and the admissions list already names this repository, so nothing outside the repo changes.

Two things to expect:

This PR is still reviewed by the old system. pull_request_target runs the base branch's copy of the workflow, and main still carries the legacy pair until this merges. The new path first runs on the PR after this one.

Superseded findings will need resolving by hand, until review-wrapper#8 is fixed. The wrapper misdetects the conversation-resolution API on this instance, so it posts a reply but leaves the conversation open.

Moves this repository from the old CI reviewers to the managed Review path — the second repository to go, after `j4k/review`. Adding the `.review-enrolled` marker and regenerating with `j4k-align --fix-workflows` does the whole swap in one pass: `review.yml` in, `pr-review.yml` and `pr-review-post.yml` out. There is no window where both reviewers run. The org already has what the new workflow needs — the `REVIEW_CAPABILITY_TOKEN` secret and the `REVIEW_SERVICE_URL` variable — and the admissions list already names this repository, so nothing outside the repo changes. Two things to expect: This PR is still reviewed by the old system. `pull_request_target` runs the base branch's copy of the workflow, and `main` still carries the legacy pair until this merges. The new path first runs on the PR after this one. Superseded findings will need resolving by hand, until [review-wrapper#8](https://code.j4k.dev/j4k-oss/review-wrapper/issues/8) is fixed. The wrapper misdetects the conversation-resolution API on this instance, so it posts a reply but leaves the conversation open.
ci: enroll in the managed review path
All checks were successful
PR Review / forgejo-review-approach-smart-1 generator (pull_request_target) Has been skipped
PR Review / forgejo-review-approach-luna-1 generator (pull_request_target) Has been skipped
PR Review / forgejo-review-approach-luna-2 generator (pull_request_target) Has been skipped
PR Review / forgejo-review-approach-luna-3 generator (pull_request_target) Has been skipped
PR Review / forgejo-review-code-smart-1 generator (pull_request_target) Has been skipped
PR Review / forgejo-review-code-luna generator (pull_request_target) Has been skipped
PR Review / forgejo-review-code-luna-2 generator (pull_request_target) Has been skipped
PR Review / forgejo-review-code-luna-3 generator (pull_request_target) Has been skipped
PR Review / Dispatch and observe exact review writers (pull_request_target) Has been skipped
PR Review / Prepare immutable review tools (pull_request_target) Has been skipped
PR Review / Request trusted main review (pull_request_target) Successful in 3s
commit-msg / commitlint (pull_request) Successful in 25s
Checks / quality-checks (pull_request) Successful in 44s
9add09715b
Adds the .review-enrolled marker and regenerates the workflows. Align
swaps review.yml in and removes pr-review.yml and pr-review-post.yml in
the same pass, so the repository never runs both reviewers.

Second repository to move, after j4k/review. The org already carries
the REVIEW_CAPABILITY_TOKEN secret and REVIEW_SERVICE_URL variable, and
the admissions list already names this repository.
jercik merged commit 20addf88c2 into main 2026-08-28 09:53:12 +00:00
jercik deleted branch feat/enroll-managed-review 2026-08-28 09:53:12 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
j4k-oss/review-wrapper!9
No description provided.